Case Study
Executes of ours projects
MES-integrated KLT logistics
SUPERVISOR manages a fleet of 3 MiR250 robots with FORMIGA modules holding 6 KLT containers each and closes the loop with the customer's MES system — from the production order to automatic delivery confirmation.
Autonomous forklift
Over the course of the year, it transported over 10,000 tons of products and completed 15,000 100-meter runs, reaching areas where conventional forklifts cannot fit.
Automated transport of semi-finished products from the preparation area to the production line.
3 MiR robots with Dorsal docking modules ensure smooth delivery of components, aiming to increase the efficiency of the production line by delivering parts at the right frequency.
Autonomous waste disposal - up to 132,000 liters per day
A system of 3 autonomous robots manages 24 containers and 4 bins located in docking stations positioned at 20 locations in the warehouse.